M/S Yarkay construction Co was the main contractor the Hydro steel Work is on site manufacturing and laying of Hendrace pipe and sung tank with steel structure for INTAE was executed.
The total length of Pine 6mm thick high strength Steel from Austria was used for 700 mm and 800 mm diameter pipe total length of 1037 meters and steeltrums Pavidge for pipeline The headvance pipe was tested for hydraulic pressure and Commissioned successfully and 1037 Meters for hydralic pressure and the Compeletion contificale was invece by the Austrian Consultant